WS7 Oko 40

Oko Wikcemna Topa

Monday, Nov 22 to Sunday, Nov 28, 2010: high 56, low -4

Another image from deep in the archive: November 23rd, 2005. Kent is setting the hip rafters of the cockpit roof. From the peak of that roof to the concrete floor below is 24’-0”. And that point on the floor directly below the peak is 48’-0” from the center of the hocoka. It is interesting to note that at that time there was a sliding glass door planned for where eventually a bay-bed would be built. The rough opening for the door/bay-bed is the large opening toward the bottom-right of the picture.