Monday, Aug 30 to Sunday, Sep 5, 2010: high 94, low 49
This Wednesday morning I bolted “teeth” onto the leading edge of the bobcat bucket and began digging out the area where the concrete slab of the garage will be poured. The teeth make a tremendous difference in the digging performance of the bobcat. Even as I was digging I was changing the design of the garage and of the space between it and the mechanical room. That space will become the library/meeting room when completed.