Monday, Jul 23 to Sunday, Jul 29, 2012: high 100, low 53

Dan is running a bead of caulk just below the top edge of a board of siding, which will seal against the next board when we nail it up. After five more boards, we turned our attention to installing the header trim boards above the French doors.

The picture above shows the header trim boards installed. We then finished siding the bay to the right of the doors, then sided the bay on the left. By the end of the day Friday the library walls were all sided.