WS10 Oko 25

Oko Wikcemna Nunpa ake Zaptan

Monday, Aug 12 to Sunday, Aug 18, 2013: high 89, low 51

Dan (in the background), Corey, Luis and i started sheathing the north wall of the garage on Friday. We are using 7/16” OSB. It takes parts of four 4’ x 8’ sheets per bay. The two bays above are the eastern most of the five bays.

Return to

Oko Iyawapi