WS19 Oko 13
Oko Ake Yamni

Thursday Dan and i built the curved wall in the foreground and bolted it into place. We then installed a header between it and the wall underneath the garage roof that we built on the 9th of last month. Today (Friday), cousin John helped us and we built two more walls, bolted them in place, and installed the 57’ diameter header from them back to the garage. It took us a lot of cyphering both days, but we should be able to build and install walls at a far quicker pace from now on.