WS22 Oko 9
Oko Napchinyunka

Made some good progress this week on the living room project. The tongue & groove boards are installed on the fronts of the benches and the bench seats are laying in place. They still need to be fastened down, but only after some leveling work is done. And there are three trim boards that need to be installed: a baseboard, an edge board that will cover the edge of the plywood top and extend onto the top tongue & groove board, and a trim board on top and along the wall of the bench seat. In the botton left of the picture you can see the joists for the couch seat. Was able to work on this aspect of the project this week as well.