Oko Wikcemna Zaptan ake Wanji

Oko 51, 2019
Monday, Feb 11 to Sunday, Feb 17: high 52, low -5

At noon on Monday, Dan and I had framed and sheeted the north and east walls of the sauna. We are building them on the sauna floor, then leaning them against the wall on the left of the picture. It is incredibly nice to be able to work inside in a heated space. Dan and I (and everyone else who helped here) did a lot of work outside in all sorts of inclement weather as Wingsprings was built. We feel fortunate; and I sure like to keep in mind everyone else who has worked at Wingsprings.